Estimate of Risk Level

This is a simple calculation to give an estimate of the level of risk of items of electrical equipment.

Start with a BASE RISK of 0 POINTS then add:

If the sum is 2 points or more it is GROUP A, High Risk

If the sum is 1 point it is GROUP B, Medium Risk

If the sum is 0 points it is GROUP C, Low Risk